Mary A. says, "-Built Frame and covered plasterboard, taped, painted to close off stairs to upstairs.
-Installed solid wooden door with locks.
-Built handicap depth and width long concrete stairs to basement and shingle roof covering.
-Repaired bathroom shower broken pipe. -Replaced wax seal around toilet that was leaking.
-Installed bathroom window.
-installed molding multiple rooms. -Installed new shut off valve for toilet.
-Outside repairs on house as well.
-Installed inside door knobs with locks.
-Built second floor steps anchored to house with small deck. And cut out entrance way from steps to 2nd floor as a second outside entrance. Installed outside doorway with locks.
-Installed screen door to outside.
-Installed hallway floor with laminate after installing base floor for leveling
-Installed replacement linoleum tiles in bathroom with sub floor to meet height of new floor in hallway. floor.
-Replaced Broken walkway with a new concrete walkway and french drain to prevent previous problem of puddling.
-Dug out part of outside area of basement to apply foundation tar to prevent water from entering basement.
Most recent:
-Installed security mailbox.
-Fixed shelves that collapsed. -Installed water softener ionic De-Scaler in basement.
-Closed off hole outside of house were birds were getting in.
In planning process of expanding eaves 2nd floor full dormers to convert from 1 1/2 story cape to 2 story full cape. As you can tell, I keep requesting his services over the years."See more