Howard D. says, "He was low bidder, and did a great job. He used asphalt glue to make sure the asphalt strip over concrete stayed in place, heated the asphalt before he laid it in place, pounded the asphalt with heavy hand tools for over an hour to smooth and compact it, and hand blended the edge with the existing asphalt driveway with special tools. He was also able to provide a 1 inch rising slope next to the block wall to keep running rain water away from the wall because the slope of the driveway is away from the house, and toward the block wall. He was open, honest, reasonably priced, and did excellent work on the outstanding job."See more