FAQs
- Describe a recent project you are fond of. How long did it take?
In 2022 we did a full backyard remodel on a 2 acre parcel in Columbia county, OR. This project included rain catchment integration into a 10,000 gallon water feature system with 3,800 gallon underground reservoir and biofiltration, restoration of original native oak savannah habitat, 100% native plantings, and replacement of non-native grass turf with native meadow-scape. This project took around 4 months. As the plantings continue to mature, it looks better every time I see it!