Why do kitchen renovations take so long?
Typically, kitchen remodeling projects are broken up into different phases. During each phase, there are unique factors that influence the timeframe. And these factors can slow down your project or even bring it to a halt.
Here are five reasons a kitchen renovation or remodeling project may take a long time:
1. Finding a contractor may take longer than expected.
It's crucial that you hire the best contractor or company to remodel your kitchen. "Best" can mean a couple of things (depending on your priorities), but typically you'll want a professional who is:
- Licensed, insured and bonded
- Affordable and offers fair pricing
- Experienced and has examples of their work
- Reputable in your area
- Available for work
Depending on how your search goes, this step can go by very fast — or very slowly. Don't be surprised if it takes you several weeks (instead of several days) to hire a contractor you feel comfortable with.
Related: How to hire a contractor.
2. Planning and designing is a complex process.
Designing and planning a kitchen remodel may take several weeks or even months. That's because it typically involves consultations with multiple professionals and ongoing revisions.
However, it's important not to rush this step. Laying out solid plans early on can help ensure your project’s success.
3. Kitchen renovations require intense coordination.
If you're doing a full kitchen remodel, you'll likely need the assistance of several experts. This could include plumbers, electricians, painters and general contractors. You might even want to consult an interior designer.
It can be challenging to coordinate these professionals. One group must complete their work before the next group can start. For example, contractors must put in your new countertops before installing the sink.
4. Materials can be heavy and challenging to install.
A kitchen remodel involves many elements that can be difficult to install. For example, installing new cabinets, large kitchen appliances and flooring can be cumbersome. And coordinating the successful delivery and installation of these hefty pieces can sometimes take a long time.
5. Plumbing and electrical work is also complicated.
Plumbing and electrical work are essential for any kitchen renovation. However, these tasks may require a lot of time to finish.
Things that can slow down your kitchen remodel even more.
We already went through some of the biggest reasons a kitchen remodel project may take a long time to complete.
However, some other unexpected delays and hiccups can slow down your project even more:
- Design changes. If you decide to change the layout or design of your kitchen during the renovation, this can quickly cause massive delays. Your plans will need to be redrawn and reapproved.
- Delayed delivery of materials. If your renovation materials are unavailable or taking a long time to arrive, this can cause significant delays.
- Permitting process. You'll need to obtain a permit from your local municipal government for most kitchen remodeling tasks. This process can be lengthy and require multiple inspections to ensure the proper sign-off.
- Unforeseen structural issues. During your renovation, a contractor might find structural issues (water damage, mold, pest damage, asbestos, lead, etc.). These concerns must be resolved before they can continue working.
- Weather. Even if you're not doing an outdoor project, inclement weather can still impact your timeline, causing delivery delays.
How to speed up your kitchen remodel.
It may feel like there's not much you can do to influence the timeline of your home renovation project. Fortunately, that's not the case.
By taking these steps, you can help ensure that your kitchen remodeling project is completed as quickly and efficiently as possible:
1. Have a clear plan.
First, be sure to have a clear plan and design in place before starting the renovation project. Make sure that everyone is on the same page regarding the materials and design. Have everyone give their stamp of approval before you approve the scope of work, sign the contract and your contractor starts ordering materials.
2. Choose materials, appliances and other features that are readily available.
Some materials, fixtures, designs and colors may be hard to get due to the economy and demand. If there's a shortage of your desired features, your kitchen remodeling project will take longer. You can combat this by choosing readily available materials and avoiding custom-made options.
You should also check in with your suppliers and contractors during pre-construction. Ask them about their projected delivery timeline. They should be able to tell you about any possible delays in advance.
3. Don't delay the permitting process.
Start the permitting process as soon as you can. Avoid delays by working with a knowledgeable contractor who can walk you through the permitting process. You can also conduct your own research to become more knowledgeable.
4. Work closely with your contractor.
This will help ensure all necessary materials are ordered and delivered on schedule.
Of course, you can't avoid supply chain snags. However, you and your team should be aware of potential delays affecting your timeline. This way, you can be prepared for any issues that arise.
5. Respond to your contractor quickly.
Be prepared to make decisions quickly, and communicate clearly with your contractor. Be available to answer questions when issues arise. This will help prevent the project from stalling because the team will not have to wait for your input.
Hire a kitchen remodeling professional near you.
Being as informed and organized as possible is essential to help keep your kitchen remodel on schedule. However, you will need assistance with technical tasks like the design, ordering and eventual execution of your project.
Download Thumbtack today, and hire a nearby professional to help kick-start your kitchen renovation.
FAQs
How long does it take to replace kitchen cabinets and countertops?
The time it takes to replace kitchen cabinets and countertops depends on several factors. The size of your kitchen, the complexity of the project and the availability of materials are just a few of them. Typically, these projects take a few weeks or months.
However, for countertops and cabinets, the installation itself can usually be completed within a few days.
What is the hardest part of a kitchen remodel?
The planning stages of a kitchen remodel project can be the most daunting. The first stages of the project require the most decisions. You have to decide on the desired layout and pick out appliances, materials and fixtures. You'll also need to establish connections with local contractors.
Once this phase is over, you'll have more support from professionals as you organize and execute the project.
What time of year is best to remodel a kitchen?
The best time of year to remodel a kitchen depends on a few factors. Your personal schedule, contractors’ availability in your area and your budget are among the most influential factors.
Let’s say contractors in your area don't have many clients during the winter months. If so, you may want to schedule your kitchen remodel during this time. Due to less demand, contractors may have lower rates for materials and labor during the colder season.
On the other hand, prices may be higher during the spring or summer months in your area. But this may be best because your household will be spending more time outside.
Related: 25 kitchen remodeling ideas and design trends.