FAQs
- What should the customer know about your pricing (e.g., discounts, fees)?
1). Mulching delivery and installation minimum 10 yards $850 2). Labor minimum 10 yards $500 or 8 hours including tools $1,400 3). Sod minimum 1 pallet Bermuda sod $1,000 2 pallet Bermuda $1500 3 pallet Bermuda $2,000 4 or more $600 per pallet including the sod preparing topsoil and fertilizer 4). Lawn maintenance starting the prices one time mowing edging weed eater blowing $85 5). Trees works 1 tree start pricing for $900 6). Turf starting price for $10 per sqft including materials and labor or just labor start pricing $3 per sqft ft minimum 1000sqft or $1,600 labor 8 hours including tools and equipment 7) walls start pricing $45 blocks wall Wood wall $40 for sqft including materials and labor Or just labor for $18 per sqft 8). Pavers patio walkway including materials and labor starting at $20 or labor for $12 sqft 9). Flagstone patio walkway including materials and labor starting $18 or labor for $12 sqft 10). Gutters cleaning starting at $180 We do drawing starting $800 front yard $800 back yard